منتديات العربي للمقالات
هل تريد التفاعل مع هذه المساهمة؟ كل ما عليك هو إنشاء حساب جديد ببضع خطوات أو تسجيل الدخول للمتابعة.
منتديات العربي للمقالات

العربي للمقالات
 
الرئيسيةالرئيسية  أحدث الصورأحدث الصور  التسجيلالتسجيل  دخول  

 

 Minister of Transport: waiting for security clearance to open editing station with the start of the study

اذهب الى الأسفل 
كاتب الموضوعرسالة
Admin
.:: مؤسس المنتدى ::.
.:: مؤسس المنتدى ::.
Admin


عدد المساهمات : 156
[ جنسيتك : ذكر
تاريخ التسجيل : 12/09/2014

Minister of Transport: waiting for security clearance to open editing station with the start of the study Empty
مُساهمةموضوع: Minister of Transport: waiting for security clearance to open editing station with the start of the study   Minister of Transport: waiting for security clearance to open editing station with the start of the study Emptyالسبت سبتمبر 13, 2014 5:12 pm

Eng said Hani Dahi, Minister of Transport and Communications, said that the ministry is ready to run a subway station immediately after the liberation and Rhode security approval on it, adding, "passenger comfort concerns us and concerns us but also their safety and security." The minister said at a press conference that the ministry is discussing with the Ministry of the Interior to open the station as a station interoperability with the start of the study, to relieve crowding Ramses station and said, "are ready to open the station two hours after the approval of security." The minister said that Egyptian Maritime Fleet in a deplorable state, adding that there are shortcomings and obvious in the fleet, and there is a plan to create a company for the purchase of multiple statements of activities, but it takes a study that will engage the government and the holding companies and the private sector. The minister added that deepen the waterways in the ports has become a necessity to receive ships with a large load is expected to reflect the new Suez Canal, which has a cargo capacity of 18 thousand containers. The minister pointed out that due to the completion of the development of the Cairo-Alexandria Desert Road on September 30 this, pointing out that he will be generated through the service for trucks which is the same way, which will be created on Cairo-Suez Desert. On the railways, the minister said that since 3 months there was a deficit of 187 trains, was activated to work in maintenance workshops and increase working hours, which led to the entry of 157 train service. Dahi added, "we assign to the Arab Organization for Industrialization represented manufacturers SEMAF and capable, supply 212 carriages for rail, in addition to the contract with the first company in China to manufacture trains for the supply of 25 trains and 700 full wagon train." He called on the Minister of Transport on citizens to report any cases of infringement of the rail, pointing out that this facility annually transports 560 million citizens. On the subway, the minister said that he conveys a day more than 3 million passengers, pointing out that 20 trains were imported for the first line of South Korea, and the other neighbor import 20 to begin the replacement effect from January next year. The minister said that there was no increase in the price of subway tickets by improving service, and said that the increase is linked to the improvement of the service, and would not reasonably be felt by low-income, nor will it affect the students' contributions. He added that the problem Dahi incident on the Metro station Zamalek third line under discussion, pointing out that the state decisions that take into account societal consensus but in the end, is giving priority to the public interest. And about the axis of the Suez Canal, said the Minister of Transport had been buying 4 drilling machines by Engineering Authority of the Armed Forces to reduce the expenses of digging tunnels, and pointed out that the project is located in the scope of 6 ports Egyptian ones Ain Sukhna, literary and East Port Said and others, explaining that he had a neighbor discuss the position of these ports and plans developed . The Minister of Transport that the new national road network length of 4200km in two phases, the first of which 3200km, explaining that the goal of which is to achieve economic integration with the facilities, which by industrial activities and economic and tourist. He explained that it will create a major new route 14, carried out by 16 contracting company, some of the roads were divided between more than one company to speed up the work, and said he was starting a business in the cadastral 80% of these roads.
الرجوع الى أعلى الصفحة اذهب الى الأسفل
https://arabic.0wn0.com
 
Minister of Transport: waiting for security clearance to open editing station with the start of the study
الرجوع الى أعلى الصفحة 
صفحة 1 من اصل 1
 مواضيع مماثلة
-
» Security forces imposed a security cordon in front of Zamalek Club after losing super
» Top universities need to be university cities relieves the students in the first week study
» "Minister": Denial job for teachers and students Chapter abusive Education
» Minister of Health announced today new rules for drug Suvaldy
» Karima Ahmed: I studied with the Minister of Awqaf Ibadi, despite violating the doctrine of the faith

صلاحيات هذا المنتدى:لاتستطيع الرد على المواضيع في هذا المنتدى
منتديات العربي للمقالات :: الفئة الأولى :: English Articles-
انتقل الى: